PROJECT INFORMATION: HANOI INDUSTRIAL VOCATIONAL COLLEGE

1. Project Name:

Hanoi Industrial Vocational College

2. Completion Date:

January 2025

3. Executed Categories:

  • Construction and installation of the Fire Protection System (FPS):
  • Site survey and requirements assessment.
  • Design of the FPS.
  • Installation of fire suppression equipment.
  • Installation of the fire alarm system.
  • Installation of electrical systems for FPS equipment.
  • Installation of the fire water supply system.
  • Testing and acceptance of the FPS.
  • Training and guidance on FPS usage.
  • Regular maintenance and servicing of the FPS.