Project Information: Cau Bau Industrial Cluster - Phase 2

1. Project Name:

Cau Bau Industrial Cluster - Phase 2

2. Project Introduction:

Cau Bau Industrial Cluster - Phase 2 is planned over an area of 5.29 hectares with a total investment of approximately 128.328 billion VND. The project focuses on industries such as household appliance manufacturing and timber processing, aiming to attract investment, create jobs, and foster local economic development.

3. Client/Investor:

Ha Thanh - Ministry of National Defense Joint Stock Company

4. Location:

Quang Phu Cau Commune, Ung Hoa District, Hanoi City

5. Executed Categories – Fire Protection System (FPS) Design Consulting: The project includes consulting and design for the FPS, ensuring compliance with fire safety standards:

Consulting on architectural – structural – M&E solutions in accordance with current FPS regulations.

Designing fire alarm and fire suppression systems.

Preparing cost estimates for emergency lighting and emergency exit systems.